COI-MOT Primer Course: FPSO Commissioning, Field Installation and FPSO Hook-Up/Start-Up of Offshore Production Facilities

by
4609 4609 people viewed this event.

COURSE OVERVIEW

This course is the joint-cooperative effort of Ngee Ann Polytechnic Centre of Innovation – Marine & Offshore Technology and AZUR Offshore, UK.

Success in handing over a completely commissioned facility (such as FPSO) to the operator, whether a new build or modification, is contingent upon the completion of numerous phases of the project, from the front end design and engineering through fabrication and final commissioning. Before final hook-up and installation of an FPSO can be accomplished, three interrelated phases are undertaken :

• Mechanical Completion
• Pre-Commissioning
• and Commissioning
Planning for them is critical to the schedule adherence, cost containment, successful installation and ultimate handoff for operation of the facility.

Production Hosts are only part of a Field Facility. Subsea Production equipment must be properly designed or specified and Installed in the Field.

Eventually all this equipment must be Started-Up in a correct sequence.

Case Studies and videos will be used to illustrate lessons learned from past successful projects. A DVD of the course videos and presentation Figures in colour will be distributed with the lecture notes.

WHO SHOULD ATTEND

Shipyards, Oil Rig-building yards, FPSO Construction Yards, subcontractors and equipment suppliers, offshore production and installation companies, offshore construction companies and service providers, and marine & offshore related SMEs personnel involved in design & engineering, planning, procurement, project management, engineering production, vessel construction, commercial, commissioning and administration.

COURSE CONTENT

• Introduction to Offshore Oil & Gas Production
• Planning for Commissioning and Installation Activities
• Construction and Commissioning FPSOs
• Selection of Subsea Field Equipment
• Installation of Field Production Equipment
• Examples of Commissioning and Installation Activities
• Field And FPSO Hook-Up and Start-Up
• Role of the Offshore Installation Manager and other Key Posts

AWARD

Certificate of Participation will be awarded to participants who have achieved at least 80% attendance.

COURSE DETAILS

Start Date : 10th to 11th March 2016
Duration of Course : 14 hours
Day/Time : 9.00 am to 4:00 pm
Fee : $319 + 7% GST (Singaporean and permanent resident); $420 + 7% GST (Others)

For course details and registration, please contact Mr Puah Kok Yong at pky@np.edu.sg.

Additional Details

Contact Person - Mr. Phua Kok Yong

Contact Number - +65 6460 6462

Organizer - COI-MOT

 

Date And Time

10 Mar 2016 @ 09:00 AM to
11 Mar 2016 @ 04:00 PM
 

Event Types

 

Event Category

 
Download Events iCal

Share With Friends