COI-MOT Primer Course: FPSO Commissioning, Field Installation and FPSO Hook-Up/Start-Up of Offshore Production Facilities
COURSE OVERVIEW
This course is the joint-cooperative effort of Ngee Ann Polytechnic Centre of Innovation – Marine & Offshore Technology and AZUR Offshore, UK. Success in handing over a completely commissioned facility (such as FPSO) to the operator, whether a new build or modification, is contingent upon the completion of numerous phases of the project, from the front end design and engineering through fabrication and final commissioning. Before final hook-up and installation of an FPSO can be accomplished, three interrelated phases are undertaken : • Mechanical Completion • Pre-Commissioning • and Commissioning Planning for them is critical to the schedule adherence, cost containment, successful installation and ultimate handoff for operation of the facility. Production Hosts are only part of a Field Facility. Subsea Production equipment must be properly designed or specified and Installed in the Field. Eventually all this equipment must be Started-Up in a correct sequence. Case Studies and videos will be used to illustrate lessons learned from past successful projects. A DVD of the course videos and presentation Figures in colour will be distributed with the lecture notes. WHO SHOULD ATTEND Shipyards, Oil Rig-building yards, FPSO Construction Yards, subcontractors and equipment suppliers, offshore production and installation companies, offshore construction companies and service providers, and marine & offshore related SMEs personnel involved in design & engineering, planning, procurement, project management, engineering production, vessel construction, commercial, commissioning and administration. COURSE CONTENT • Introduction to Offshore Oil & Gas Production • Planning for Commissioning and Installation Activities • Construction and Commissioning FPSOs • Selection of Subsea Field Equipment • Installation of Field Production Equipment • Examples of Commissioning and Installation Activities • Field And FPSO Hook-Up and Start-Up • Role of the Offshore Installation Manager and other Key Posts AWARD Certificate of Participation will be awarded to participants who have achieved at least 80% attendance. COURSE DETAILS Start Date : 10th to 11th March 2016 Duration of Course : 14 hours Day/Time : 9.00 am to 4:00 pm Fee : $319 + 7% GST (Singaporean and permanent resident); $420 + 7% GST (Others) For course details and registration, please contact Mr Puah Kok Yong at pky@np.edu.sg.Additional Details
Contact Person - Mr. Phua Kok Yong
Contact Number - +65 6460 6462
Organizer - COI-MOT